PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Black Iron Duct delivery 1.jpg Black Iron Duct delivery 2.jpg Block work at the Attorneys Room Facing South.jpg Constructing the parapet along the high roof East Elevation.jpg Continued installing Stair -3 at the 3rd floor Facing East.jpg Installed exhaust fans at the 1st floor Facing South.jpg Installed junction boxes outside Stairwell -4 Facing East.jpg Installing bathroom carriers at 2nd Floor bathroom 242 Facing North.jpg Installing waste piping at the 2nd floor bathrooms Facing South.jpg
Previous pageNext page Continued installing Stair -3 at the 3rd floor Facing East
Continued installing Stair -3 at the 3rd floor Facing East